1. Concourse Building No.1 comprising of the following preliminary scope of works:

1.1 Design and construction of concourse building No. 1 including the installation of facilities. The structure of the building is 4 storey building with an area of approx. 216,000 square meters, having exit doors connecting to 28 attached bays, out of which 8 attached bays are capable for parking the aircraft A-380 and 20 attached bays are for parking aircraft B-747-400.

1.2 Construction work of attached bay terminal No.1 for 28 attached bays capable for parking the aircraft A-380 8 bays and aircraft B747-400 20 bays, including the construction of taxiway to the apron and facilities relating to fuel pipe system (to be managed by other operator). Approximate area 960,000 square meters.

1.3 Design and construction of south tunnel extension and passenger transportation system (APM) and related facilities such as Baggage Handling System (BHS), by construction of tunnel connecting the end of the tunnel constructed in the Phase 1 to concourse building No.1. Total length of the connecting tunnel is 700 m.

2. Passenger Terminal comprises of the following preliminary scope of works:

2.1 Design and construction of the extension at the east passenger terminal and related facilities on the area of 14,580 square meters to enhance the capability of the main terminal.

2.2 Design and construction of the office building with car park by construction the building in to 2 parts. The front is the 4 storey building with an area of 35,000 square meters, providing space and facilities related to the rear part as 5 storey car park building and 1 storey deck with an area of 32,000 square meters including the connection to the car park building adjacent to the passenger terminal.

3. Design and construction of public utility system comprises of the following preliminary scope of work:

The construction of public utility system namely high voltage electricity system, water supply system, chill water system for air conditioners to connect to concourse building no.1, Passenger Transport System (APM) and supporting the runway no. 3 in the future. Construction of the electric substation, electric power supply, Supervisory Control And Data Acquisition (SCADA); Construction of main water supply pipe and waste water supply pipe to be connected to the old system.